Floor plans and finishes attract much of the attention during a custom build. Radon planning deserves a place on the same decision list, including what will be installed and how the finished home will be tested. Resolve those responsibilities while the construction scope is still being developed.
Discuss the system before construction
EPA’s guidance on radon in new homes explains that radon can enter through foundation openings and describes radon-resistant construction features. A passive system includes a route for soil gas to vent outdoors; a fan can be added when needed. EPA also emphasizes that testing is the way to determine whether the completed home has a radon problem, including homes built with passive systems.
Ask your builder to explain the proposed approach for your foundation and site. Request a written description of what is included, who is responsible for installation and where the relevant information will appear in the construction documents.
Coordinate the details with the house plan
Bring radon planning into the custom home building process before choices are locked in. Ask how the planned system relates to the foundation, service routes and future access. Leave technical design and installation decisions to qualified professionals working with the applicable local requirements.
If the proposal uses the word “ready,” ask exactly what that means. A note that a future system could be added is different from an itemized description of features actually included in the build.
Assign the testing responsibility
EPA advises testing a home with a passive system immediately after moving in. Put a testing task on the handover checklist with a named person responsible for arranging it. Ask your state radon program or a qualified testing professional about suitable testing procedures and how results should be interpreted.
Agree how the result will be delivered and who will explain any recommended next step. Do not treat a pipe visible in the house or a line in the specification as a substitute for a test result.
Keep a useful handover record
Store the system description, installer contact, test report and any subsequent work records with the home’s other service documents. Ask for operating and maintenance instructions for equipment that is installed. If later remodeling changes the lowest living level or affects the system, bring these records into that project’s planning discussion. A clear handover makes it easier to follow up after the builders leave.